1. Prepare Your Plans & Drawings

Engage a licensed architect or engineer to draw your building plans according to the Puducherry Building Bye‑Laws & Town & Country Planning Rules

Comply with OBPS guidelines: plot boundary, setbacks, room layouts, stairs, elevations, etc. Refer to the OBPS “Layer Matrix” and “Reasons for Rejection” handbooks available on the Puducherry Planning Authority website

2. Register & Login to OBPS Online

Go to the new Online Building Permission System (OBPS)

Register (if new), and then log in to provide application details, attach electronic plans and documents like land title, structural certificates, etc.

3. Application & Scrutiny Fees – Pay

Application fees: ₹10 per plan

Scrutiny fees (residential “pucca”):

Up to 300 m² or less: ₹1 / m² built‑up area;

Over 300 m²: ₹1.50 / m²

There are also small charges for amenities like septic tanks, wells, compound walls—see Appendix I-A

There is also a ₹10 service charge on every issued No Objection Certificate (NOC)

4. Automated eScrutiny & NOCs

The system integrates eDCR (Electronic Development Control Regulations)—it auto‑verifies your plan against building rules

If your development requires NOCs (e.g., from PWD, electricity, etc.), those departments scrutinize and reply online. If they don’t reply within 21 working days, the system treats them as approved

5. Approval & Permit Issuance

For a normal residential building up to 2 dwelling units (ground + first floor), approval normally comes within 10 working days, provided there are no NOCs involved

OBPS system provides safe online e‑signing and digital issuance of the building permit

6. Revisions, Validity & Regularization

First revision: ₹1 / m²; second: ₹0.50; third: ₹0.25; fourth and later ones: free

If the permit expires before construction, you can renew it at 50% of original fees

For unauthorized current constructions or unapproved layouts, regularization can be applied for by paying applicable charges

Summary Timeline & Advantages

PhaseLineage
e‑scrutiny + NOCs (if necessary)≤ 21 working days (considered approval)
Granting of permit (residential ≤2 units)≤ 10 working days after-complete submission

It is completely online, increases transparency, and reduces human intervention

Final Checklist

  • E‑copy of certified building plans (according to OBPS guidelines)
  • Land title deed, structural engineer certificates, NOC documents
  • OBPS account & online application completed
  • Fees incurred: application, examination, NOCs
  • Submit & wait for auto‑approval or reply to any questions asked
  • Download digitally signed building permit, start construction